Construction & infrastructure

New Tashkent: Zaha Hadid Architects unveiled the Alisher Navoi International Scientific Research Centre, Uzbekistan

The new city on the eastern edge of Tashkent – put into context for European companies

· 9 Sources

Scroll
Construction & infrastructure9 Sources

Published · last updated · 14 Oct 2024 – 23 Oct 2024

Zaha Hadid Architects has unveiled the design for the Alisher Navoi International Scientific Research Centre in New Tashkent, Uzbekistan. The 23,000-square-metre complex will house the Navoi State Museum of Literature, a 400-seat auditorium, an International Research Centre, and a residential school for 200 students. The architecture utilizes locally produced Tashkent bricks and passive cooling principles.

Project Overview and Components

The Alisher Navoi International Scientific Research Centre is a cultural and educational hub designed by Zaha Hadid Architects in New Tashkent. The complex spans 23,000 square metres and serves as the centrepiece of a new cultural quarter within the 25,000-hectare masterplan by Cross Works.

Architectural Design and Materials

The design features arched facades and interiors crafted from locally produced bricks from Tashkent kilns. The architecture reinterprets vernacular building types, using streamlined forms that echo the arches and vaults of medieval Uzbek architecture.

Passive Cooling and Sustainability

The design incorporates passive architectural principles to ensure minimal energy consumption while maintaining optimal indoor conditions.

Key facts

  • Architect: Zaha Hadid Architects (ZHA)
  • Structural, Environmental, and MEP Consultant: Buro Happold
  • Masterplan: Cross Works
  • Total Area: 23,000 square metres
  • Museum Collection: 3,500 historical manuscripts and books
  • School Capacity: 200 students

All sources (9)

  1. zaha hadid architects designs cultural center dedicated to music and literature of uzbekistanDesignboom · · EN
  2. Zaha Hadid Architects Reveals Design for New Scientific Research Centre in Tashkent, UzbekistanArchDaily · · EN
  3. ZHA’s Alisher Navoi Center has arched facades and interiors of local bricksParametric Architecture · · EN
  4. ZHA unveils design for New Scientific Research Centre featuring giant wind towers in UzbekistanWorld Architecture Community · · EN
  5. Архитектурное бюро Zaha Hadid Architects представило рендеры уникального центра Алишера Навои в Новом ТашкентеPodrobno.uz · · RU
  6. Weaving brick forms define Uzbek cultural centre by Zaha Hadid ArchitectsDezeen · · EN
  7. Представлен проект центра имени Алишера Навои в «Новом Ташкенте» — Афиша ТашкентаAfisha.uz · · RU
  8. Представлен проект Международного научно-исследовательского центра имени Алишера Навои в Новом ТашкентеANONS.uz · · RU
  9. Zaha Hadid Architects reveals design for cultural centre in UzbekistanDomus Web · · EN

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn