Requirement and specification
We go through the technical requirement with your engineers and close the gaps that would otherwise produce incomparable offers.
The right supplier, specified correctly, delivered on terms that hold
AETEK identifies and coordinates European technologies, manufacturers and suppliers for industrial customers in Central Asia — and helps European companies source components and materials from the region.
We work on technically demanding industrial goods, where the specification decides whether an offer is comparable at all.
Typical requirements are production machinery, process and plant equipment, automation and measurement technology, spare and wear parts, energy and environmental technology, and the engineering or service packages that go with them. In most cases the difficult part is not finding a supplier — it is making sure that what arrives matches what the plant actually needs.
We do not run a catalogue and we do not resell from stock. We work from your requirement: clarifying it where it is incomplete, finding suppliers who can meet it, and making the offers comparable before anyone talks about price.
We go through the technical requirement with your engineers and close the gaps that would otherwise produce incomparable offers.
A shortlist of manufacturers who genuinely build what you need — including the mid-sized European specialists that are hard to find from outside.
References, capacity, export experience into the region and the ability to deliver service — checked before the first quotation is requested.
Offers brought onto one basis: scope of supply, interfaces, spare parts, commissioning, training and warranty — not just the machine price.
Prices, payment terms, delivery terms and guarantees — negotiated in the supplier's language and written so both sides read them the same way.
Coordination of documents, shipment, customs requirements and commissioning dates with your forwarder and the supplier, until the equipment runs.
Every order passes the same checkpoints, whichever direction it travels. Most problems are caught at the first two.
Access to European manufacturers without the usual detour through intermediaries: specification support, supplier search, qualification and the full commercial process in Russian, German and English. Our representatives on the ground also speak the national language of their country.
Sourcing of components, materials and services from the region, plus support with local content requirements when a project asks for a share of local supply.
Two rail routes carry most freight between the EU and Central Asia. Which one a shipment can take depends on the goods, the sanctions rules that apply to them and the time a project can wait.
Transit time on the Middle Corridor, in days
Sources: trans.info (first TIR run China–Türkiye, IRU), Caliber.az (Red Bridge, 25 Aug 2025), GetTransport (Caspian crossing), Delta Global (Türkiye to Uzbekistan via Iran), Times of Israel (Turkish–Iranian border, 24 Sep 2026), Astana Times (sanctions on Iran), Jamestown (Armenia route).
Sources: World Bank, The Middle Trade and Transport Corridor (2023) and Integration: World-Class Trade Logistics along the Trans-Caspian Transport Corridor (2026). Projections assume the investments and reforms named there.
Procurement across this corridor fails on details: a missing interface, an untranslated tolerance, a delivery term nobody checked.
Answer five short questions about your situation. The bars show which of the three ways to start fits best, and change with every answer.
A first orientation, not advice. Before anything is recommended, we look at your case in detail.
In a procurement project we work for the buyer. Where we also represent a manufacturer in the region, we say so before that supplier is considered.
Yes, provided they are technically relevant — spare and wear parts are often where a supplier relationship is proven before a larger investment follows.
No. Transport and customs clearance stay with specialists. We coordinate documents, terms and dates between the supplier, your forwarder and the plant.
The technical requirement — even an incomplete one — the intended use, the site conditions and the target timeline. We come back with the questions that need answering first.
More than a purchase? Industrial project development
Selling into the region instead? Business development in Central Asia
We will tell you what is missing and what a realistic supplier shortlist looks like.
Industrial Procurement — Europe & Central Asia
The right supplier, specified correctly.
Describe the equipment or parts you need, where they will be used, and the timeline you are working towards.
Prefer email? info@aetek.eu
Amtsgericht Aschaffenburg
HRB 14157
DE288091462
DE644795536634916
AETEK® is a registered word mark of AETEK GmbH, German Patent and Trade Mark Office (DPMA), Reg. No. 30 2023 202 928 (expires 31 Jan. 2033). View registration certificate (PDF)
Legal Entity Identifier (LEI) 391200MNLJ2E0R0I6V98, issued 16 Aug. 2021 by Bundesanzeiger Verlag. View in GLEIF register
AETEK company flyer 2026 – Business Development as a Service, in English. View flyer
AETEK Business Model Disclosure (pre-NDA, one page, October 2026), in English. Download PDF