Construction & infrastructure

New Tashkent: Cross Works master plan built around a digital twin

The new city on the eastern edge of Tashkent – put into context for European companies

· 1 Source

Scroll
Construction & infrastructure1 Source

Published · last updated · 31 Dec 2025

The New Tashkent project is conceived as a digital twin city driven by President Shavkat Mirziyoyev to address systemic failures in the existing metropolis. Spanning 20,000 to 25,000 hectares east of the current city, the development aims to accommodate 2.5 million residents through a master plan by Cross Works. Construction follows a timeline extending to 2045, with the first phase focusing on District 1 as the administrative and social core.

The master plan employs a flexible, principle-based approach guided by the Tashkent Code, emphasizing human-scale development and architectural diversity. Design philosophy centers on the “15-minute city” model, ensuring residents can reach essential infrastructure such as schools and clinics within a 15-minute walk or cycle. Strategically located between the Chirchiq and Karasu Rivers, the development utilizes natural mountain airflows and local hydrology to mitigate urban heat islands. By relocating administrative and cultural buildings, the government aims to de-densify the old city for preservation while providing a clean slate for Smart City concepts.

New Tashkent is managed through digital twin technology, a real-time virtual replica developed by Cross Works that integrates 2D and 3D urban analyses. This tool acts as a transparency mechanism, allowing stakeholders and communities to visualize project status and provide feedback. Associated with this vision is the Central Asia Smart City in Ohangaron, a 6,000-hectare project with a $10 billion budget. The centerpiece of the Ohangaron project is the 29,000-square-meter Alisher Navoi International Scientific Research Centre, designed by Zaha Hadid Architects. The center features arched facades and interiors built from local bricks, inspired by traditional Central Asian wind towers for natural ventilation.

Key facts

  • Projected population capacity: 2.5 million residents.
  • Total area: 20,000 to 25,000 hectares.
  • Master plan developer: Cross Works.
  • Construction timeline extends to 2045.
  • Central Asia Smart City budget: $10 billion.
  • Alisher Navoi Centre size: 29,000 square meters.

All sources (1)

  1. Digital Twin Technology Shapes the New Tashkent Masterplan by Cross Works ArchitectsParametric Architecture · · EN

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn