Mining & Metals

Mining & Metals in Central Asia.

For European suppliers of mining equipment, process technology and industrial services

Copper, gold, uranium, coal, ferroalloys and aluminium: mining and metallurgy are the backbone of the region's industry — and the segment where European technology is most consistently in demand.

Scroll
01 — The Sector

Where the demand
actually sits.

Mining in the region is not one market. It is a handful of large groups, a layer of mid-sized operators and a growing service industry around them.

Kazakhstan is the world's largest uranium producer and a significant source of copper, chrome, ferroalloys and coal. Uzbekistan operates some of the largest gold and copper assets in the region, Kyrgyzstan is dominated by gold, and Tajikistan combines aluminium with a growing mining sector. Much of the installed equipment dates from an earlier era and is being replaced step by step.

That creates steady demand for crushing and grinding, flotation, conveying, dewatering, laboratory and analysis technology, automation, wear parts and the service structures behind them — usually as modernisation of a running operation rather than a greenfield project.

Close-up · Deposit map

Where the ore comes out of the ground.

The large deposits of the five countries on one map. Choose a country, select a site — or narrow the map down to one of the ores below it.

All deposits

The map shows the large sites of all five countries and every ore at once. Choose a country above to narrow it down, or a site to see what is found there.

Aktogay Open pit

  • Copper

One of Kazakhstan's largest copper mines, in the east of the country, with its own concentrator — expanded in recent years.

Kazakhstan

Bozshakol Open pit

  • Copper
  • Gold

A large copper and gold open pit in the Pavlodar region in the north.

Kazakhstan

Zhezkazgan

  • Copper

Copper mining and smelting in the middle of the steppe — one of the oldest copper centres of the region.

Kazakhstan

Chu-Sarysu basin In-situ leaching

  • Uranium

Most of Kazakhstan's uranium is produced by in-situ leaching in the south. Kazakhstan has been the world's largest producer since 2009, with around 40 % of global output.

Kazakhstan Details

Khromtau

  • Chrome ore

Some of the largest chrome ore deposits in the world. The ore becomes ferrochrome for the steel industry.

Kazakhstan

Rudny

  • Iron ore

Iron ore from the Kostanay region, processed into concentrate and pellets.

Kazakhstan

Vasilkovskoye

  • Gold

One of the largest gold deposits in Kazakhstan, near Kokshetau.

Kazakhstan

Karaganda

  • Coal

Coking coal for the steelworks in neighbouring Temirtau.

Kazakhstan

Ekibastuz Open pit

  • Coal

Some of the largest open-pit coal mines in the world; the coal feeds the power plants of the north.

Kazakhstan

Ridder · Altai

  • Zinc
  • Lead
  • Copper
  • Gold
  • Silver

Polymetallic ores — zinc, lead, copper, gold and silver — processed in Ridder and Oskemen.

Kazakhstan

Muruntau Open pit

  • Gold

One of the largest open-pit gold mines in the world, in the Kyzylkum desert — operated by the Navoi mining and metallurgical combine.

Uzbekistan Details

Uchkuduk

  • Uranium

Uranium from the Kyzylkum, produced by in-situ leaching.

Uzbekistan

Almalyk

  • Copper
  • Gold
  • Silver
  • Zinc

Copper, gold, zinc and molybdenum. The expansion of the Almalyk combine is one of the largest mining projects in the region.

Uzbekistan Details

Kumtor ~4,000 m

  • Gold

One of the highest gold mines in the world. Gold is Kyrgyzstan's largest export.

Kyrgyzstan Details

Kadamjay

  • Antimony

A long tradition of antimony processing in the south of Kyrgyzstan.

Kyrgyzstan

Anzob

  • Antimony

Antimony and mercury ore north of Dushanbe. Tajikistan is one of the world's largest antimony producers.

Tajikistan Details

Penjikent

  • Gold

Gold mining in the Zeravshan valley: the Jilau and Taror mines, the country's largest gold operation.

Tajikistan

Garlyk

  • Potash

Potash: a mining and processing plant for potassium fertiliser in the east of Turkmenistan.

Turkmenistan

Balkhash Smelter

  • Copper

The copper smelter on the northern shore of Lake Balkhash — together with Zhezkazgan, one of the two large copper processing centres of Kazakhstan.

Kazakhstan

Oskemen Metallurgy

  • Zinc
  • Lead
  • Titanium
  • Silver

Zinc, lead and silver smelting on the Irtysh, plus the titanium-magnesium works — the metallurgical centre of East Kazakhstan.

Kazakhstan

Zyryanovsk

  • Zinc
  • Lead

Lead-zinc mining in the Altai ore belt, part of the polymetallic cluster around Oskemen and Ridder.

Kazakhstan

Bakyrchik

  • Gold

A well-known gold deposit in the east, about 110 km south-east of Semey.

Kazakhstan Details

Zhairem · Atasu

  • Manganese
  • Lead
  • Zinc

Manganese ore from the Ushkatyn deposits, plus lead, zinc and barite from Zhairem — in the Ulytau region.

Kazakhstan Details

Shalkiya

  • Zinc
  • Lead

One of the largest zinc deposits in the world, north-east of Zhanakorgan in the south — about 104 million tonnes of lead-zinc ore.

Kazakhstan

Arkalyk

  • Aluminium

Bauxite of the Torgai region — the raw material of the alumina refinery in Pavlodar.

Kazakhstan

Pavlodar Processing

  • Aluminium

Alumina refinery and aluminium smelter: a complete chain from bauxite to metal.

Kazakhstan

Boguty

  • Tungsten

Kazakhstan's first tungsten mine, about 180 km east of Almaty, opened in 2024. Kazakhstan holds some of the world's largest tungsten reserves.

Kazakhstan Details

Stepnogorsk

  • Uranium

Uranium mines of the Kokshetau region in the north and a mining and chemical complex.

Kazakhstan

Ingichka

  • Tungsten

Tungsten mine and processing in the foothills of the Zeravshan range, in the Samarkand region.

Uzbekistan

Angren Open pit

  • Coal

Open-pit lignite mine, one of the largest mines in the country; the coal feeds the power plants.

Uzbekistan

Jerooy

  • Gold

Kyrgyzstan's second-largest gold deposit, about 60 km from Talas, with free gold in quartz veins.

Kyrgyzstan

Bozymchak Open pit

  • Copper
  • Gold

An open-pit copper mine with its own concentrator in the Jalal-Abad region; gold is a by-product.

Kyrgyzstan

Taldy-Bulak

  • Gold

The Levoberezhny gold deposit in the Kemin district, east of Bishkek.

Kyrgyzstan

Kanimansur

  • Silver
  • Zinc
  • Lead

One of the largest silver deposits in the world, with lead and zinc, in the north of Sughd province.

Tajikistan

Tursunzoda Smelter

  • Aluminium

The aluminium smelter, one of the largest in Central Asia and one of the country's largest power users.

Tajikistan

Kara-Bogaz-Gol Lagoon

  • Salts

Sodium sulphate and other salts from the lagoon on the Caspian coast — one of the few places in the world where sodium sulphate occurs naturally in commercial quantities.

Turkmenistan

Positions are approximate; the selection shows major sites, not every mine. Multi-coloured dots mark sites with several ores.

Select a site to light up all of its ores — or an ore, to light only that one and show only its sites on the map. Select it again to show all.

AuGold

No. 1 export of Kyrgyzstan

Muruntau in Uzbekistan is one of the largest open-pit gold mines in the world; Kumtor in Kyrgyzstan works at around 4,000 m.

AgSilver

Mostly a by-product of copper, zinc and lead ores — in Kazakhstan's Altai and at Almalyk in Uzbekistan.

CuCopper

Open pits at Aktogay and Bozshakol, smelting in Zhezkazgan and Balkhash. In Uzbekistan the Almalyk combine is expanding.

ZnZinc

Polymetallic ores of East Kazakhstan, smelted in Oskemen and Ridder; zinc is also produced at the Almalyk combine in Uzbekistan.

PbLead

From the same polymetallic ores — lead and zinc usually come out of the ground together.

MnManganese

Manganese ore from the Zhairem deposits in central Kazakhstan — for steel and ferroalloys.

FeIron ore

Iron ore and pellets from Rudny in the Kostanay region; steel from the works in Temirtau.

CrChrome ore

Some of the largest chrome ore deposits in the world, near Khromtau — processed into ferrochrome.

UUranium

≈ 40 % of world output, from Kazakhstan

Produced by in-situ leaching in southern Kazakhstan and in the Kyzylkum desert of Uzbekistan.

AlAluminium

A complete chain from bauxite to metal in Pavlodar; the smelter in Tursunzoda is one of Tajikistan's largest power users.

SbAntimony

Top 3 Tajikistan among world producers

Antimony ore from Anzob in Tajikistan; a long tradition of processing in Kadamjay, Kyrgyzstan.

TiTitanium

Titanium sponge and magnesium from Oskemen — one of only a handful of producers worldwide, supplying aerospace.

WTungsten

Kazakhstan holds some of the world's largest tungsten reserves; the Boguty mine near Almaty opened in 2024. In Uzbekistan, tungsten is mined at Ingichka.

CCoal

Coking coal from the Karaganda basin feeds the steelworks in Temirtau; the open-pit mines of Ekibastuz supply the power plants of the north.

KPotash

Potash for fertiliser from the Garlyk plant in eastern Turkmenistan.

NaSalts

Sodium sulphate and other salts from the Kara-Bogaz-Gol lagoon on the Caspian coast — one of the few places in the world where sodium sulphate occurs naturally in commercial quantities.

Close-up · Deposits in detail

Eight sites where things are moving now.

Of the deposits on the map, these are the ones where money is being invested right now: who runs them, what is being built, and where European equipment and services come in.

Kazakhstan · Abai region
  • Gold

Kyzyl · Bakyrchik

OperatorSolidcore Resources (formerly Polymetal International)

104,000 ozgold equivalent from Kyzyl in Q3 2026
300,000 tof concentrate a year: capacity of the new Ertis plant

What is happening

Kyzyl mines the Bakyrchik gold deposit underground. Its concentrate is refractory and has so far been processed by third parties, so Solidcore is building its own pressure-oxidation (POX) plant, Ertis, in the Pavlodar special economic zone, at a capital cost of about $1 billion. In July 2026 it raised $600 million in loans from the EBRD and a bank syndicate; a further loan from Germany's KfW IPEX-Bank is being negotiated.

Where suppliers come in

A POX plant needs autoclaves, pumps, valves, filters and process control, and service for decades. The underground mine needs drilling, loading and ventilation equipment and spare parts all the time.

Uzbekistan · Tashkent region
  • Copper
  • Gold
  • Silver

Almalyk · Yoshlik-1 and Kalmakyr

OperatorAlmalyk Mining and Metallurgical Complex (AGMK), state-owned

60 million tof ore a year: capacity of copper concentrator No. 3
500,000 tof copper a year: the government's target

What is happening

In March 2026 Almalyk started its third copper concentrator, built since 2021 for about $2.7 billion and fed from the new Yoshlik-1 open pit. At full load the combine's concentrate output rises from 2,400 to 5,000 tonnes a day. A new copper smelter (about $2.5 billion) and a fourth concentrator are being prepared.

Where suppliers come in

Grinding, flotation, thickening and tailings on this scale, and a new smelter: wear parts, spares, instrumentation and service are needed for decades.

Uzbekistan · Navoi region
  • Gold

Muruntau

OperatorNavoi Mining and Metallurgical Company (NMMC), state-owned

≈ 3 million ozof gold a year from NMMC (2023–2024)
101 million ozgold resource of Muruntau, as reported

What is happening

Muruntau is one of the largest open-pit gold mines in the world and the core of NMMC. The company has placed Eurobonds in London and has been preparing a listing in London and Tashkent; the timing is open.

Where suppliers come in

A pit of this size means long haul roads, drilling and blasting, crushing and leaching on a very large scale, with a buyer that reports to international standards as a Eurobond issuer.

Kazakhstan · Ulytau region
  • Zinc
  • Lead
  • Manganese

Zhairem · Ushkatyn

OperatorZhairem GOK, part of Kazzinc (Glencore group)

5 million tof ore a year: open pit and concentrator
72 million tapproved ore reserves of Zhairem, about 3.5 % zinc

What is happening

Zhairem holds zinc-lead, barite and iron-manganese ore in one deposit. Kazzinc acquired it in 2014 and started a polymetallic plant there in 2021. With the manganese ores of Ushkatyn nearby, the area is one of Kazakhstan's main sources of zinc and lead concentrate and of manganese.

Where suppliers come in

Several ore types at one site mean several process lines (selective flotation, gravity separation, dewatering), and that is where specialised European technology fits.

Kazakhstan · South Kazakhstan
  • Uranium

Chu-Sarysu basin · uranium

OperatorKazatomprom and its joint ventures

27,500–29,000 tof uranium planned for 2026 (100 % basis)
No. 1Kazakhstan among the world's uranium producers

What is happening

Kazakh uranium is not dug out but recovered in situ: a solution is pumped through wells into the ore-bearing sand, and the uranium-bearing solution is pumped back up and processed on site. For 2026 Kazatomprom has cut its nominal output by about a tenth.

Where suppliers come in

Every wellfield needs drilling, submersible pumps, pipework, measurement and sorption plants, and new fields are opened all the time as old ones run out. Uranium comes with strict export-control and nuclear rules; we check them at the start.

Kyrgyzstan · Issyk-Kul region, about 4,000 m
  • Gold

Kumtor

OperatorKumtor Gold Company, 100 % Kyrgyzaltyn (state)

12,081 kgof gold in 2025 (388,418 oz)
1,902 mof underground workings driven in 2025

What is happening

One of the highest gold mines in the world. Alongside the open pit the company is building an underground mine: a feasibility study for the Saddle and Stockwork zones is complete, and in 2025 the fleet was renewed with new drilling rigs, mining and service equipment.

Where suppliers come in

Altitude, cold and glacier water are hard on every machine. Underground mining needs ventilation, rock support, dewatering and drilling rigs; four new self-propelled rigs have already been ordered.

Kazakhstan · Almaty and Karaganda regions
  • Tungsten

Boguty · Northern Katpar · Upper Kairakty

OperatorBoguty: Aral Kegen (Jiaxin International). Katpar and Kairakty: Cove Capital (70 %) with Tau-Ken Samruk (30 %)

3.3 million tof ore a year: the Boguty concentrator
$1.1 billionestimated investment at Katpar and Kairakty

What is happening

Kazakhstan holds some of the world's largest tungsten deposits. Boguty has been producing since 2024. Northern Katpar and Upper Kairakty, planned for about 12,000 tonnes a year together, are in the definitive feasibility study, due by the end of 2027; US EXIM and DFC have issued letters of interest for the financing.

Where suppliers come in

Turning ore into ammonium paratungstate (APT) is hydrometallurgy and chemistry, work for European process engineering, as buyers in Europe and the US look for tungsten from more sources.

Tajikistan · Ayni district, Sughd region
  • Antimony
  • Gold

Anzob · Konchoch

OperatorKonchoch: TALCO Gold (50 % TALCO, 50 % Tibet Huayu Mining)

5,000 tof metallic antimony a year: new plant since July 2026
≈ 20 %Tajikistan's share of world antimony output (2025)

What is happening

Anzob and the Konchoch deposits in the north make Tajikistan one of the three largest antimony producers. Until recently mostly concentrate left the country; in July 2026 TALCO Gold commissioned a plant for up to 5,000 tonnes of metallic antimony a year. Konchoch also holds about 50 tonnes of gold.

Where suppliers come in

The EU lists antimony as a critical raw material. Further processing, for example to antimony trioxide, and the environmental technology that smelting needs are where European suppliers come in.

Status: November 2026. All figures as published by the operators or the sources named with each site.

02 — What We Do

Getting you to the right mine.

Mining customers are few, well known to each other, and sceptical of suppliers who appear once. The work is about being credible with the technical people.

Operation and project mapping

Which mines and plants exist, what they process, what equipment is installed, and which expansion or modernisation plans are real.

Access to technical decision-makers

Chief engineers, maintenance and processing managers, procurement — the people whose opinion survives the tender committee.

Tender and procurement monitoring

Procurement cycles at the large groups run on their own rhythm. We follow them so your offer is ready before the window opens.

Service and spare parts concept

How your equipment will be maintained 3,000 kilometres from your factory — the question every serious mining customer asks first.

Local partner selection

Service companies and suppliers who already work inside the operations, checked for capability rather than for a nice brochure.

Offer and negotiation support

Technical clarification, scope comparison and the commercial terms — in Russian, which is the working language of every mine in the region.

Close-up · From pit to metal

Where your equipment sits in the flowsheet.

A mine is a chain of stations, and every one of them buys, wears out and needs service. Select a station to see the typical demand.

Laboratory, automation and measurement run along the whole chain.

01Extraction & haulage

Drilling, loading and haulage, underground or in the open pit. Ventilation and safety are not optional here.

02Crushing

Primary and secondary crushers reduce the ore to a size the mills can take. High wear, high spare-parts demand.

03Grinding & classifying

Mills, cyclones and screens — the largest energy consumer of the plant, and the first place where efficiency pays.

04Flotation & separation

Separates the valuable minerals from the rest. Recovery is measured in tenths of a percent — and in money.

05Dewatering & tailings

Thickeners, filters and water recovery — under growing pressure from water scarcity and environmental rules.

06Smelting & refining

Furnaces, electrolysis and gas cleaning turn concentrate into metal — a field for process, measurement and emission technology.

03 — Where

Four mining markets, different logics.

Kazakhstan

Scale and variety

Uranium, copper, chrome, ferroalloys and coal, with large groups running professional procurement and long investment cycles.

Uzbekistan, Kyrgyzstan, Tajikistan

Gold, copper and aluminium

Large gold and copper operations in Uzbekistan, gold in Kyrgyzstan, aluminium and a growing mining sector in Tajikistan — often with state involvement.

Close-up · Fit check

Five questions — and where you would start.

Answer five short questions about your situation. The bars show which of the three ways to start fits best, and change with every answer.

1What do you supply?
2Which operations do you know in the region?
3What is missing most?
4How technical is the sale?
5When should the first conversations happen?

0 / 5 answered

  • Matching you to the right mines
  • Introductions to operators
  • Continuous presence at the operations

Your starting point appears here once all five questions are answered.

A first orientation, not advice. Before anything is recommended, we look at your case in detail.

04 — Questions

Frequently asked questions.

Are these markets open to European suppliers?

Yes, and European process technology has a strong reputation there. Competition comes mainly from Chinese and Russian suppliers on price and delivery time.

How do you handle export control and compliance?

We work within EU export rules and flag anything that looks sensitive early. The final compliance decision stays with you and your export control function.

Do we need a local service presence?

For equipment that runs continuously, some form of local service — own, partner or shared — is usually a condition for winning the order at all.

Is small equipment worth the effort?

Often yes. Wear parts, instruments and laboratory equipment open doors at operations that would never start with a large investment from an unknown supplier.

How we work: business development in Central Asia

05 — Let's Talk

Which operations should know your name?

Tell us what you build. We will come back with an honest first assessment of the fit.

Mining & Metals — Central Asia

From market potential to business.

Describe your equipment or service and the ore types or processes it is built for. We will tell you where it fits in the region.

Prefer email? info@aetek.eu

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn