Construction & infrastructure

New Tashkent: ZHA Unveils Design for Ali Sher Nawoi Institute

The new city on the eastern edge of Tashkent – put into context for European companies

· 1 Source

Scroll
Construction & infrastructure1 Source

Published · last updated · 6 Nov 2024

Studio Zaha Hadid Architects (ZHA) has presented a new design for the Ali Sher Nawoi Institute in New Tashkent, Uzbekistan. The 29,000 m² complex will house the Nawoi State Museum of Literature, a 400-seat auditorium, an International Research Center, and a boarding school for 200 students. The project aims to support Uzbek literary and cultural heritage and will form the foundation of the planned cultural district of New Tashkent.

The 23,000 m² main part of the complex features organic, funnel-shaped forms inspired by traditional Central Asian and Middle Eastern wind catchers. Hollow interiors allow natural air circulation for summer cooling, while blocks act as thermal chimneys on windless days to regulate indoor temperature. During hot months, fans and water mists assist the natural cooling system to ensure thermal comfort with minimal energy consumption. Deep canopies protect facades from summer sun while allowing optimal winter sunlight for interiors. The design uses bricks produced in traditional Tashkent kilns to connect modern forms with local culture. Glazed facades between brick blocks bring natural light into the interior and open the building to surrounding courtyards. These courtyards provide light, support natural ventilation, and create meeting places. The center is designed according to passive construction principles to maintain optimal conditions while minimizing energy consumption.

The central part of the institute houses the Navoi State Museum of Literature, dedicated to research and the preservation of Uzbek literary heritage. The museum consists of 13 exhibition halls to collect and display valuable manuscripts, books, and archival materials. The facility includes a conservation workshop and storage for historically valuable collections. The project also includes an International Research Center and a boarding school for 200 students focused on Uzbek language, literature, and music.

Key facts

  • The 25,000-hectare site was planned by Cross Works.
  • The institute is named after the 15th-century poet and linguist Ali Sher Nawoi.
  • The complex has a total floor space of 29,000 m².
  • The auditorium seats 400 people.
  • The boarding school accommodates 200 students.
  • The museum features 13 exhibition halls.

All sources (1)

  1. The fifth element from Zaha Hadid Architects, or how to harness the power of the elements in New TashkentArchitektura & Biznes · · EN

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn