Uzbek state-owned company Navoiyuran has commenced mining operations at the Qizilkok uranium deposit in the Navoi region. The site holds 9,400 tonnes of uranium reserves with an estimated mine life of 15 years.
Navoiyuran has commenced commercial mining at the Qizilkok deposit in the central Uzbek region of Navoi. Extraction utilizes a low-reagent in-situ leaching (ISL) oxygen technology. This method increases uranium recovery while reducing production costs by two to three times compared to conventional methods. The International Atomic Energy Agency states that ISL technology offers environmental and safety advantages over traditional mining and milling.
The deposit contains 10,900 tonnes of mineral resources and 9,400 tonnes of uranium reserves, with an estimated mine life of 15 years. With an annual production capacity of 1,200 tonnes of uranium, Qizilkok is expected to play a key role in future production growth. In 2025, Navoiyuran's total production reached 7,000 tonnes of natural uranium. Qizilkok is the third-largest project in the company's portfolio after Sugrali and Uchkuduk, with further expansion potential to the north.
Navoiyuran is the world's sixth-largest uranium producer, operating 43 deposits with a mineral resource base of 151,100 tonnes of uranium. Uzbekistan holds approximately 139,000 tonnes of identified reserves and is the world's fifth-largest producer and supplier. The company plans to develop four new deposits in the coming years. General Director Djamal Sabakhonovich Fayzullayev stated that the strategy aligns with Uzbekistan's state program to expand uranium mining and processing volumes through 2030. Pilot industrial operations began in December 2024.
Project: Qizilkok uranium deposit · Uzbekistan · Planned · $3.8 bn
Key facts
- Start of mining at the Qizilkok deposit in the Navoi region
- Annual production capacity of 1,200 tonnes of uranium
- Uranium reserves of 9,400 tonnes with a mine life of 15 years
- Navoiyuran produced a total of 7,000 tonnes of natural uranium in 2025