Companies Sanoat Energetika Guruhi (SEG) and Kontiki-Exploration have discovered the largest deposit of heavy oil and bitumen in Uzbekistan in the Zeravshan Depression. Estimated reserves amount to nearly 100 million tons, with a projected annual production capacity of up to one million tons.
Significant amounts of heavy oil and bitumen have been identified on the field named 'Yangi Uzbekiston' in the Zeravshan Depression. The exploration took place on the border of the Samarkand and Navoi regions. Drilling operations penetrated layers of gravelites and sandstones from the Albian, Senomanian, and Turonian periods, all saturated with hydrocarbons. Initial exploration drilling in this area began on May 15, 2021.
The estimated reserves of the field amount to nearly 100 million tons of bituminous oil. With an annual drilling capacity of 1,500 wells, a maximum annual production potential of one million tons is projected. The total investment volume for the development of the field over a twelve-year period is estimated at $2.5 billion.
Shokir Fayzullaev, CEO of Sanoat Energetika Guruhi (SEG), emphasized that the discovery is part of the company's strategy to increase oil production to 1.6 million tons by 2030. Current annual production has been increased from 425,000 to 500,000 tons. Sergey Astakhov, Director of the Oil Exploration Company Kontiki, noted that in addition to the largest field at shallow depths, a new oil-bearing region has been opened, which could contain lighter oil upon deeper development.
To extract hydrocarbons, SEG has engaged international oil service companies. These include McDANIEL and GenOil from Canada, BYIS Manufacturing and O’NEILL Industries from the USA, as well as Energy and Engineering, Veraton I.T.C., and the Kazan Federal University from Russia.
Project: Yangi Uzbekiston oil field · Uzbekistan · Planned · $2.5 bn
Key facts
- Reserves: nearly 100 million tons of heavy oil and bitumen
- Investment volume: $2.5 billion over 12 years
- Projected production: up to 1 million tons per year
- Location: Zeravshan Depression, border of Samarkand and Navoi regions
All sources (1)
- TRT на русском - В Узбекистане обнаружили крупнейшее месторождение нефтиTRT Russian. · · RU