Energy

Kazakhstan: Preliminary study for fourth oil refinery and petrochemical complex begins

Investors, volumes and stages of the region's major projects – for European suppliers

· 1 Source

Scroll
Energy Kazakhstan1 Source

Published · last updated · 20 May 2026

Kazakhstan has initiated preparations for a large-scale oil refining complex. SK Ondeu, a subsidiary of Samruk-Kazyna, is the project customer, with a six-month preliminary study. The facility is designed to process up to 10 million tons of oil annually.

Start of preliminary study and project structure

At the directive of President Kassym-Jomart Tokayev, Kazakhstan has initiated preparations for a large-scale oil refining complex, which has the potential to become the center of a future petrochemical cluster. The Ministry of Energy coordinates inter-agency cooperation as the authorized state body. The project customer is SK Ondeu, a subsidiary of the Samruk-Kazyna Fund. Over six months, an international engineering team will conduct comprehensive pre-project studies to provide the government with technical and economic parameters.

Site selection and raw material supply

The preliminary study includes determining the most effective raw material supply model. Options for processing oil from the Kashagan and Tengiz fields, as well as using mixed raw materials via existing pipeline infrastructure, are being considered. Key aspects of site evaluation include transport logistics, rail infrastructure access, proximity to sales markets, environmental requirements, and utility network availability. Energy Minister Yerlan Akkenzhenov emphasized that decisions on location and configuration will be made exclusively based on economic efficiency and technical calculations.

Scientific integration and outlook

The scientific intensity of the project will be ensured by involving domestic research centers and specialized universities. These institutions will develop improved fuel standards, technologies, and catalysts, as well as train the future workforce. Based on the pre-project documentation, the government will decide whether to proceed to the detailed design phase, attract international investors, and commence construction. The initiative aligns with the Concept for the Development of the Oil Refining Industry of the Republic of Kazakhstan for 2025-2040.

Project: Expansion of Kazakhstan's oil refining capacity · Kazakhstan · Planned · $2.0 bn

Key facts

  • Project customer: SK Ondeu (subsidiary of Samruk-Kazyna)
  • Preliminary study duration: six months
  • Capacity: up to 10 million tons of oil annually
  • Raw material options: Kashagan, Tengiz, or mixed raw materials
  • Coordination: Ministry of Energy of Kazakhstan

All sources (1)

  1. Construction project for Kazakhstan’s fourth oil refinery enters practical phaseQazinform · · EN

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn