Uzbek President Mirziyoyev approved design reports presented by representatives of CSWADI and CSCEC International during an inspection of the New Tashkent project. The President approved the Chinese solution for rainwater and groundwater collection and utilization, instructing staff to strengthen exchanges with international technical teams to apply advanced technology to the construction.
Key facts
- CSWADI is designing infrastructure for Phase I Zone 3, covering roads, water supply, sewage, rainwater, utility tunnels, heating, and electrical engineering.
- The New Tashkent project covers approximately 25,000 hectares.
- President Mirziyoyev received the design reports alongside officials including the Prime Minister and ministers.
All sources (1)
- 中企在新塔什干项目中获乌兹别克斯坦总统称赞丝路新观察 · · ZH