Construction & infrastructure

New Tashkent: Energy ministry will not promise an end to power outages

The new city on the eastern edge of Tashkent – put into context for European companies

· 1 Source

Scroll
Construction & infrastructure1 Source

Published · last updated · 1 Jun 2026

A representative of Regional Electric Networks said New Tashkent will get modern, stable grid infrastructure and promised to present results on stabilising the network. Elbek Saidov, chief specialist at the Ministry of Energy, declined to promise that outages will stop entirely, citing external factors such as cables damaged during earthworks.

Elbek Saidov, chief specialist of the Ministry of Energy, refused to promise the complete elimination of accidents due to external factors. Saidov cited cable damage during earthworks as a cause, noting that excavator drivers may tear cables despite warning signs. Saidov added that new accidents are possible even after repairs with splice installation, both at the site of the initial break and in other sections.

Key facts

  • Regional Electric Networks will present results on grid stabilization in New Tashkent.
  • The city will receive modern and stable power grid infrastructure.
  • The Ministry of Energy does not guarantee the absence of power outages.
  • Accidents may result from external factors such as cable damage during construction.

All sources (1)

  1. «Есть нюансы» — в Минэнерго не стали обещать отсутствие отключений света в Новом ТашкентеSpot (Telegram) · · RU

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn