A new tunnel has opened on the 4R12 highway for traffic heading to the Chimgan Mountains and Charvak Reservoir. The tunnel is located 400 meters after New Tashkent and prohibits movement for heavy trucks and vehicles transporting dangerous goods.
Key facts
- The tunnel serves traffic heading to the Chimgan Mountains and Charvak Reservoir in the Bo'stonliq district.
- For traffic moving in the opposite direction, an exit from the 4R12 highway to Yangi Uzbekiston Street has been organized.
- A radar with a speed limit of 60 km/h will be installed in the tunnel.
All sources (1)
- По дороге в Чимган открылся новый тоннельKun.uz · · RU