A musical fountain in New Tashkent has set two Guinness World Records, reported the Directorate for Construction under the Cabinet of Ministers of Uzbekistan. The facility became the tallest open-air musical fountain on the planet with a water jet height of 232.69 meters. It also achieved the world’s largest projection on a circular water screen, covering an area of 2,617.23 square meters.
The fountain surpassed the previous record of the Chinese complex in Jiangsu Province, where the comparable figure was 204.7 meters. The previous recorded figure for the projection area was 2,400 square meters. Official Guinness World Records adjudicator Maggie Luo handed over certificates confirming the uniqueness of the facility to the Uzbekistan representative office.
Key facts
- The water jet height reached 232.69 meters.
- The projection area amounted to 2,617.23 square meters.
- The previous record for the water jet was 204.7 meters.
- The previous record for the projection area was 2,400 square meters.
All sources (4)
- В Новом Ташкенте открылся фонтан — обладатель двух рекордов ГиннессаANONS.uz · · RU
- Fountain in New Tashkent sets two Guinness recordsArzuw news · · EN
- Фонтан в Новом Ташкенте установил два рекорда ГиннессаArzuw news · · RU
- Фонтан в Новом Ташкенте установил два мировых рекорда Гиннесса. ВидеоPodrobno.uz · · RU