Construction & infrastructure

New Tashkent: President Reviews 232-Meter Fountain Project

The new city on the eastern edge of Tashkent – put into context for European companies

· 5 Sources

Scroll
Construction & infrastructure5 Sources

Published · last updated · 24 Mar 2026 – 25 Mar 2026

President Shavkat Mirziyoyev reviewed the design of a musical fountain complex planned for construction in New Tashkent on March 24. The project includes a superfountain capable of reaching a height of 232 meters within an 8-hectare site. The President emphasized the need to prepare the venue for large-scale Independence Day events later this year.

The musical fountain complex will cover approximately 8 hectares, featuring a central reservoir with a water surface area of 6.3 hectares. A superfountain will be built capable of projecting water jets to a height of up to 232 meters. The complex will also include a floating platform with a diameter of 100 meters and a circular water screen with a radius of 185 meters for 360-degree image projection.

Green areas, retail outlets, dining facilities, and service centers are planned around the water body. President Shavkat Mirziyoyev paid particular attention to the project's concept, technical solutions, and the comprehensive development of the surrounding area. He emphasized the importance of ensuring high-quality retail, dining, and service facilities for visitors. The complex is expected to serve as a modern venue for cultural events, holidays, and festivals. The Head of State noted the need to hold spectacular events dedicated to Independence Day at this venue in the current year.

Key facts

  • The superfountain will reach a height of 232 meters.
  • The total site area is approximately 8 hectares.
  • The reservoir has a water surface area of 6.3 hectares.
  • A circular water screen will have a radius of 185 meters.
  • A floating platform with a diameter of 100 meters will be installed.
  • Technical equipment will be located in a two-storey underground structure.

All sources (5)

  1. President reviews musical fountain project in New Tashkentpresident.uz · · EN
  2. В Новом Ташкенте построят фонтан, стреляющий водой на 232 метраPodrobno.uz · · RU
  3. В Новом Ташкенте построят музыкальный фонтанный комплекс на 8 гаSpot.uz · · RU
  4. Uzbekistan to build 232-meter superfountain in New Tashkent fountain complexDaryo · · EN
  5. В Новом Ташкенте построят фонтанный комплекс с высотой струи до 232 метровKun.uz · · RU

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn