The master plan for 'New Tashkent', designed for two million residents, was officially presented on March 4. The project covers nearly 20,000 hectares and includes the construction of a new international airport with a 208,000 sq m terminal.
City Master Plan Details
The total area of the new city is planned to be 19,720 hectares, with a calculated population density of 101 people per hectare. The northern border runs near Yangibazar, the eastern border follows the Karasu river, and the southern border adjoins the current capital. Approximately 50% of the territory will be occupied by construction, 30% by green zones and public spaces, and 5% by transport and engineering infrastructure.
Construction and Infrastructure
The total construction fund is estimated at 150 million square meters, with residential real estate accounting for about 60.4 million sq m. Commercial facilities will occupy 55.1 million sq m, public and social infrastructure 20.1 million sq m, cultural institutions 8.5 million sq m, and administrative buildings 2.7 million sq m.
Key facts
- The airport consortium includes Vision Invest (45%), Sojitz Corporation (30%), Incheon International Airport Corporation (15%), and Uzbekistan Airports (10%).
- The development of New Tashkent is divided into six stages.
- VAT and profit tax rates are fixed until 2028 to ensure investment predictability.
- The new city will include the University of New Uzbekistan, the National Library, and a new Nizami University campus.
All sources (4)
- Новый Ташкент на 2 млн жителей: представлен мастер-план будущего городаKun.uz · · RU
- Представлен мастер-план Нового Ташкента на 2 млн жителейНовости Узбекистана — Upl.uz · · RU
- Для аэропорта «Новый Ташкент» на первом этапе планируется построить терминал площадью 208 тысяч квGazeta.uz (Telegram) · · RU
- В новом аэропорту Ташкента построят терминал на 208 тыс. кв. м и две ВППGazeta.uz · · RU