Education & health

New Tashkent: International University of Civil Aviation planned on a 20-hectare site

The new city on the eastern edge of Tashkent – put into context for European companies

· 3 Sources

Scroll
Education & health3 Sources

This summary was written by an AI.

Published · last updated · 27 Nov 2026

Uzbekistan plans to establish the International University of Civil Aviation of Uzbekistan in New Tashkent, with a 20-hectare plot to be allocated for its construction. The project was presented at a meeting of President Shavkat Mirziyoyev on the development of the aviation market. At the same meeting, tax relief was proposed for international airports and for airlines that train Uzbek citizens as pilots. The construction timeline, cost, admission conditions and foreign partners have not yet been named.

The university

The university is to comprise a student campus, training and simulation centres and research laboratories. It is intended to train pilots and other civil aviation specialists. Locating the university next to the new airport complex would give students access to training simulators, technical facilities and practical training. The final model of cooperation between the university, the airport and airlines has not yet been presented.

Concessions for airlines

Airlines that commit to training and then employing local pilots are to receive concessions when hiring foreign specialists. The social tax rate for such foreign employees is to be cut to 1%, and the fee for issuing work permits reduced by a factor of 30. This is meant to let companies temporarily bring in foreign pilots and instructors at lower cost, while in return training Uzbek citizens and hiring them afterwards. Requirements on the number of cadets, the length of training and the mandatory employment period have not been specified.

Tax exemption for airports

International airports in Uzbekistan are to be exempt from property tax and land tax until 2030. The funds saved may not be spent on current expenses or unrelated projects but must go into reconstructing terminals, upgrading equipment and developing other infrastructure. The expected savings and the list of airports that will benefit have not yet been disclosed.

Fleet targets and the new airport

The fleet of Uzbek airlines is to reach 150 aircraft as early as 2027 and at least 250 by 2030. In October 2025, the authorities had reported that local airlines' fleet had grown from 26 to 105 aircraft and planned to increase it to 180 within five years. A new international airport is under construction near New Tashkent on 1.3 thousand hectares in the Urtachirchik and Kuyichirchik districts of Tashkent region. The capital's current airport is designed for 11 million passengers a year and already handles 9 million, while the authorities expect more than 24 million passengers a year by 2040.

Key facts

  • University site: 20 hectares in New Tashkent
  • Social tax for foreign specialists at airlines training local pilots: 1%; work permit fee cut 30-fold
  • International airports: exempt from property and land tax until 2030
  • Fleet target: 150 aircraft in 2027, at least 250 by 2030
  • New airport near New Tashkent: 1.3 thousand hectares

All sources (3)

  1. В Новом Ташкенте откроют авиационный университетOblako.uz · · RU
  2. В Новом Ташкенте построят Международный университет гражданской авиацииПресса.uz – Новости Узбекистана · · RU
  3. Мирзиёев предложил создать авиационный вуз в Новом ТашкентеPolites News · · RU

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn