The ATLAS team, in collaboration with the capital's khokimiyat and the New Tashkent directorate, developed a design code for New Tashkent based on extensive research. The ATLAS bureau team followed an algorithm that included studying city development plans, the Tashkent master plan to 2045, and the New Tashkent master plan when developing the design code.
Development Process and Zoning
The ATLAS bureau team followed an algorithm that included studying city development plans, the Tashkent master plan to 2045, and the New Tashkent master plan. The design code is the result of extensive research, communication, analytical and creative work by architects, analysts, urban researchers, industry experts, and designers.
Climatic Adaptations and Traditional Techniques
The development of Tashkent's design code was primarily influenced by the city's climatic features, where air heats up to 45 degrees and above. The problem of city heating is extremely relevant for Tashkent, so ATLAS studied all global practices for reduction and included relevant ones in the design code. Traditional houses used thick walls of sun-dried brick or clay to protect against heat during the day and release accumulated heat slowly at night. Fabric curtains and wooden blinds are used in traditional houses to protect premises from overheating, and these elements are important to study during the development of the design code.
Energy Efficiency and Environmental Measures
Energy-efficient and water-saving technologies are embedded in the design code, such as solar-powered streetlights or rainwater collection systems for plant irrigation. Tashkent's design code takes into account main recommendations for reducing emissions, including construction dust. New Tashkent will be built on land where bird routes have long been established, and the city will face this problem. The ATLAS bureau team included bird-visible window structures and proposed sticking patterns based on historical ornaments and motifs on glass.
Urban Activity and Traffic Analysis
Another feature of studying the context is the analysis of Tashkent's activity using the study of human flows, the diversity of visited places, and the overlay of various data layers. The highest traffic density in Tashkent is near the airport, railway and bus stations, which is especially noticeable during rush hours. Shopping centers and markets are also the most visited zones in the city. The ATLAS team previously conducted a study of markets as centers of attraction, confirmed by the analysis of Tashkent's markets.
Metrics and Spatial Distribution
To determine the activity of districts, architects and designers use the Shannon Index, an indicator of the distribution and concentration of attraction points per unit of area. In Tashkent, high diversity and concentration of attraction points is observed in the center of the city, in the north-east and in the north-west. Low diversity indicators are noted in peripheral areas in the east and in other less dense zones.
Key facts
- The design code incorporates bird-visible window structures with patterns based on historical ornaments.
- Climatic features, with temperatures reaching 45 degrees and above, heavily influenced the design code.
- Energy-efficient technologies include solar-powered streetlights and rainwater collection systems.
- The Shannon Index is used to measure the concentration of attraction points per square kilometer.
- High traffic density is concentrated near the airport, railway, and bus stations.