More than 100 projects are currently being implemented in New Tashkent, with construction work covering 3 million square meters as of 2025. The Directorate for the Construction of New Tashkent has denied reports regarding a planned 'town for the rich,' stating that existing cottages are designated for foreign ambassadors. Murad Buildings called for increased transparency in land allocation and more lenient deadlines, later clarifying that its speech supported transparent market rules.
Project Scale and Demographics
New Tashkent is a large-scale project located east of Tashkent between the Chirchik and Karasu rivers, covering almost 20,000 hectares. The first stage of construction will cover 6,000 hectares and aims to create infrastructure for 600,000 people by 2033. The project is included in the master plan of the capital until 2045.
Infrastructure and Green Technology
Thirty percent of New Tashkent is allocated for parks and squares, including a Central Park of 420 hectares with 200,000 trees. The city will receive over one gigawatt of green energy from solar and hydro plants equipped with storage systems. An international airport is planned to accommodate projected passenger traffic growth, with construction overseen by Berk Albayrak. Transport infrastructure will include a line with a length of 21 km, nine stations, and a daily capacity of 230,000 passengers.
Real Estate Market and Developer Statements
Vyacheslav Krivosheev, operating director of Murad Buildings, stated that the state provides support for infrastructure and utilities, allowing developers to build quickly. Krivosheev highlighted difficulties regarding land allocation transparency and unrealistic deadlines set by Tashkent Invest. Murad Buildings later clarified that the main point of the speech was the recognition of positive market changes and support for transparent rules. The company stated that interpreting individual quotes out of context does not correspond to the content of the speech.
Key facts
- New Tashkent is planned for 2 million people, with the first stage accommodating 600,000 by 2033.
- 30% of the city area is allocated for parks and squares.
- Investment agreements for 24 commercial lots total $2 billion.
- The city will receive over one gigawatt of green energy from solar and hydro plants.
- Cottages in the first stage are designated for foreign ambassadors and international organization representatives.
- New Uzbekistan University is building a $200 million campus for 10,000 students.
All sources (10)
- Central Asia Building New CitiesThe Jamestown Foundation · · EN
- Новый Ташкент: проект, где находится, как идет строительство, фотоДвижение.ру · · RU
- Новый Ташкент: территория, равная двум Парижам, рекордный фонтан и первые переездыZamin.uz · · RU
- В столице и Новом Ташкенте презентовали проекты двух новых парковНовости Узбекистана — Upl.uz · · RU
- Murad Buildings призывает повысить прозрачность выделения земли в ТашкентеSpot (Telegram) · · RU
- Обновлено: Murad Buildings призывает повысить прозрачность выделения земли в ТашкентеSpot · · RU
- Is a rich man's town being built in New Tashkent: the truth has been revealed, official commentZamin.uz · · EN
- Yeni Taşkent'te zenginler kasabası inşa ediliyor mu: gerçek açıklandı, resmi açıklamaZamin.uz · · TR
- В Новом Ташкенте не будет «городка для богатых» — ДирекцияSpot (Telegram) · · RU
- В Новом Ташкенте не будет «городка для богатых» — ДирекцияSpot · · RU