Construction & infrastructure

New Tashkent: Climate resilience and green infrastructure in urban planning

The new city on the eastern edge of Tashkent – put into context for European companies

· 1 Source

Scroll
Construction & infrastructure1 Source

Published · last updated · 15 Aug 2026

New Tashkent incorporates climate change considerations into its construction, utilizing water and energy-saving solutions alongside green infrastructure. The project mandates that at least 30% of each plot be green space to reduce the heat island effect and lower cooling costs. Urban planning also addresses risks from abnormal heat and flooding through a comprehensive water resource management system.

The New Tashkent project emphasizes green and blue infrastructure, with blue infrastructure comprising canals, lakes, ponds, and aryk channels. Temur Ahmedov of the Directorate for the creation of New Tashkent noted that aryk channels are used for irrigation and help create a cooler microclimate through water evaporation. A mandatory requirement for each plot is that at least 30% of the area must be green space, a condition written into developer contracts. Green spaces serve the functional goal of reducing the heat island effect, which could save more than 1 billion kWh per year on cooling in the first stage. Additionally, at least 30% of rainwater on each plot must be collected and used for irrigation.

Buildings in New Tashkent are required to use international green building standards such as LEED, BREEAM, and EDGE. EDGE is a standard that assesses the use of water, energy, and materials. Water consumption is estimated at approximately 150 liters per person per day, compared to 250–300 liters in existing Tashkent. The city plans to utilize various energy sources, with a significant portion coming from renewable sources like solar and hydro energy. Public transport development includes the launch of trams, metro, and electric buses. The '15-minute city' concept is applied to organize space so that residents do not need to use a car for every trip.

The total area of New Tashkent exceeds 25,000 hectares. The first stage covers 6,000 hectares, with construction beginning in mid-2024 and completion planned for around 2035. This phase is designed to accommodate 600,000 residents. The project aims to create a full-fledged city with government and cultural buildings, residential houses, schools, hospitals, clinics, and future clean industry enterprises. Temur Ahmedov stated that the vision for the city is calculated for 10, 20, 30, and even 50 years ahead. Planning also accounts for risks associated with extreme heat and flooding through a planned water resource management system.

Key facts

  • Total area of New Tashkent is more than 25,000 hectares.
  • First stage covers 6,000 hectares and is designed for 600,000 residents.
  • Construction of the first stage began in mid-2024.
  • Completion of the first stage is planned for around 2035.
  • At least 30% of each plot must be green space.
  • At least 30% of rainwater on each plot must be collected for irrigation.

All sources (1)

  1. Чем прохладнее, тем экономнее: При строительстве Нового Ташкента учитывается изменение климатаDaryo · · RU

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn