The New Tashkent project has reached a construction volume of 3 million square meters by the end of 2025. The sale of 24 commercial plots has secured investment contracts worth €1.72 billion. The city is planned to accommodate up to 2 million residents and create 200,000 jobs.
Status and Economic Significance
By the end of 2025, the construction volume in New Tashkent reached 3 million square meters. The sale of 24 commercial plots resulted in investment contracts worth €1.72 billion. The construction activities have created 10,000 jobs so far. Several ministries and state bodies have begun operations in temporary facilities to test the city's infrastructure.
Energy and Sustainability
The energy infrastructure integrates existing hydropower capacities, upgraded where possible, along with a 400-megawatt solar farm currently under construction. Within the city, an additional 100-megawatt solar farm and a tri-generation facility converting waste into heat and electricity are being built. Buildings are designed according to international standards such as LEED, BREEAM, and EDGE to ensure energy efficiency and water conservation.
Infrastructure and Mobility
A 21-kilometer metro line connecting New Tashkent to the capital is planned, alongside the reintroduction of tram lines with dedicated corridors. Eight multimodal transport hubs allow transfers between different modes of transport. These hubs include underground parking with a capacity of 200 cars and 30 motorcycles/scooters in the first phase, as well as charging stations for electric vehicles.
Housing, Education, and Sports
The Sharq Bahori residential area covers 95 hectares and will accommodate approximately 15,000 families. Construction of the New Uzbekistan University, designed for 10,000 students, is underway with completion expected in 2027. Additionally, a 55,000-seat football stadium built to FIFA standards is being constructed to be ready for the 2027 U-20 World Cup.
Key facts
- Construction volume by end of 2025: 3 million m²
- Investment volume from auctions: €1.72 billion
- Jobs created in construction: 10,000
- Commercial plots sold: 24
- Planned population: 2 million
- Planned jobs: 200,000
- Solar farm under construction: 400 MW
- Additional solar farm in the city: 100 MW
All sources (10)
- New Tashkent: Building a sustainable city from scratchmsn.com · · EN
- The green city set to transform Uzbekistan’s capitalEuronews · · EN
- New Tashkent: Uzbekistan’s Bet on Green, People-Centered MegacityCaspian Post · · EN
- New Tashkent: Building a sustainable city from scratchmsn.com · · EN
- New Tashkent: Building a sustainable city from scratchmsn.com · · EN
- New Tashkent: Building a sustainable city from scratchmsn.com · · EN
- New Tashkent: Building a sustainable city from scratchmsn.com · · DE
- «Новый Ташкент»: строительство экологического города с нуляcheck-point.kz · · RU
- Koca başkenti yıkıp akıllı şehir yapacaklarSözcü Gazetesi · · TR
- 우즈베키스탄, 지속가능도시 ‘뉴 타슈켄트’ 만든다ESG비즈니스리뷰 · · KO