The Tashkent rail vehicle manufacturing and repair plant has commenced production of rail vehicles in cooperation with the Russian group Transmashholding. The shares of Uzbekistan Railways were transferred to Transport Engineering Center, which holds them in trust.
The Tashkent rail vehicle manufacturing and repair plant has commenced the implementation of a project to produce rail vehicles for railways and the metro system in cooperation with the Russian holding Transmashholding. This development is reported in a report by the Ministry of Economy and Finance of Uzbekistan on the service sector for the months of January to May. The production includes vehicles for national rail transport as well as for the metro system.
The strategic direction of the plant has changed due to a restructuring of ownership. The shares of the state-owned company Uzbekiston temir yollari in the charter capital of the Tashkent plant, previously at 90.02 percent, were transferred to the company AUA. This company transferred the shares to the trust management of Transport Engineering Center in accordance with a contract dated January 22, 2025. This center was founded by Russian companies and is owned by VTR Holdings Limited, registered in Astana (87%), and Vektor technologitscheskich resheniy, based in Moscow (13%).
Operational control lies with Russian managers who have entered the plant's supervisory board. The new members include representatives of the parent company Transmashholding and its subsidiaries, including Alexander Chebakov, Alexander Losmanov, Ygor Gulayev, and Kirill Lachugin. The background to this development is a visit by President Shavkat Mirziyoyev in March 2024, during which plans for the production of new types of wagons, including electric multiple units and metro trains, were presented. The transaction was not publicly communicated in detail.
Project: Krantas Group special vehicle plant · Uzbekistan · Planned
Key facts
- Start of production of rail vehicles and metro trains at the Tashkent rail vehicle manufacturing and repair plant.
- Transfer of 90.02% of shares from Uzbekiston temir yollari to AUA and subsequent trust management by Transport Engineering Center.
- Contract for trust management dated January 22, 2025.
- New members of the supervisory board are managers of the Russian Transmashholding group.
- Owners of Transport Engineering Center: VTR Holdings Limited (Astana, 87%) and Vektor technologitscheskich resheniy (Moscow, 13%).