Energy

Uzbekistan: Memorandum for construction of underground gas storage facility with CNPC

Investors, volumes and stages of the region's major projects – for European suppliers

· 3 Sources

Scroll
Energy Uzbekistan3 Sources

Published · last updated · 26 Sep 2025 – 30 Sep 2025

The Ministry of Energy of Uzbekistan and China National Petroleum Corporation (CNPC) have signed a memorandum on the construction of an underground gas storage facility. The project is to be realized at the Korabayir field in the Kashkadarya region and will have a capacity of 1.5 billion cubic meters.

The Ministry of Energy of Uzbekistan and China National Petroleum Corporation (CNPC) have signed a memorandum on cooperation for the construction of an underground gas storage facility (UGS). The plan involves building the facility at the Korabayir field in the Koson district of the Kashkadarya region. Preliminary scientific studies have determined that the 12th horizon of the field is most suitable for storage.

The new storage facility is designed to hold 1.5 billion cubic meters of active natural gas. The Uzbek Ministry of Energy considers this strategically important for stabilizing energy supply and smoothing out seasonal consumption fluctuations. The collaboration builds upon talks held by Uzbek President Shavkat Mirziyoyev with CNPC management in January 2024. Details were discussed again in September 2025.

CNPC is already active in Uzbekistan: via a joint venture with Uzneftegaz, it built a section of the Central Asia–China pipeline, participates in the development of the Mingbulak oil field and several gas-condensate fields in the Bukhara region. Additionally, CNPC began modernizing the Bukhara refinery in 2024. Uzbekistan currently operates two underground gas storages: Gazli in the Bukhara region and Khojaabad in the Andijan region.

Project: Underground gas storage · Uzbekistan · Agreed

Key facts

  • Signing of a memorandum between the Ministry of Energy of Uzbekistan and CNPC
  • Location: Korabayir field, Koson district, Kashkadarya region
  • Planned capacity: 1.5 billion cubic meters of active natural gas
  • Existing CNPC projects in Uzbekistan: Pipeline section, Mingbulak field, Bukhara refinery modernization
  • Existing storages in Uzbekistan: Gazli and Khojaabad

All sources (3)

  1. В Узбекистане планируется построить новое подземное газохранилище совместно с КитаемГазета.uz · · RU
  2. Uzbekistan, CNPC ink deal on construction of underground gas storage facilityQazinform · · EN
  3. В Кашкадарье построят подземное газовое хранилище объёмом 1,5 млрд кубометровKun.uz · · RU

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn