Transport & logistics

Uzbekistan, Kyrgyzstan, China: Start of construction of the China-Kyrgyzstan-Uzbekistan railway

Investors, volumes and stages of the region's major projects – for European suppliers

· 4 Sources

Scroll
Transport & logisticsCentral Asia (regional)4 Sources

Published · last updated · 20 Dec 2024 – 24 Dec 2024

On December 27, 2024, the official start of construction for the China-Kyrgyzstan-Uzbekistan railway was announced. The 486-kilometer project aims to diversify trade routes between Asia and Europe and reduce dependence on existing corridors via Russia and Kazakhstan.

Construction Start and Contract Signing

Official construction work on the China-Kyrgyzstan-Uzbekistan railway will begin on December 27, 2024. This was announced by Kyrgyz President Sadyr Japarov on December 20 at the III People's Kurultai. On the same day, an investment agreement covering planning, construction, financing, operation, and maintenance was signed at the Yntymak-Ordo presidential palace in Bishkek. The agreement was signed by Kyrgyz Minister of Transport and Communications Absattar Syrgabayev and Zhong Shengui, Chairman of the Board of Directors of the railway company. Uzbek Ambassador to Kyrgyzstan Saidikram Niyazkhodjaev and Chinese Chargé d'affaires Li Baoze also attended the ceremony.

Project Scope and Technical Details

The total length of the line is 486 kilometers, with approximately 312 kilometers located in Kyrgyzstan. The planned route follows Kashgar – Torugart – Makmal – Djalal-Abad – Andijan. In Kyrgyzstan, the project includes the construction of 18 stations, 81 bridges, and 41 tunnels with a total length of over 120 kilometers. The line will feature a gauge change: from the Chinese border to Makmal (165.5 km), the Chinese standard gauge of 1435 mm will be used; from Makmal to Djalal-Abad (146.2 km), the Russian broad gauge of 1520 mm will be employed. A transshipment and sorting hub is planned in Makmal for cargo transfer.

Financing and Ownership Structure

The estimated total cost of the project ranges between 4.665 and $4.7 billion. Financing is split equally between equity contributions from the participating states and a non-commercial loan from China. Ownership shares in the joint venture are 51% for China and 24.5% each for Kyrgyzstan and Uzbekistan. China will provide a loan of $2.35 billion, while the states must contribute equity totaling $2.315 billion. In July 2024, Uzbekistan committed to contributing $255 million to the project company's charter capital.

Economic Significance and Timeline

The project is described as a strategic link between East and West, intended to boost trade, tourism, and industry. It aims to reduce dependence on transit routes via Russia and Kazakhstan and open new markets in Southeast Asia, West Asia, the Middle East, and Europe. Construction is expected to take approximately six years, with the start originally planned for October 2024. Annual transport volume is projected to reach 5 million tons by 2035.

Project: China-Kyrgyzstan-Uzbekistan Railway · Central Asia (regional) · Under construction · $4.7 bn

Key facts

  • Construction start: December 27, 2024
  • Total length: 486 km (approx. 312 km in Kyrgyzstan)
  • Estimated cost: 4.665 – $4.7 billion
  • Ownership: China 51%, Kyrgyzstan 24.5%, Uzbekistan 24.5%
  • Financing: $2.35 billion loan from China, remainder equity from states
  • Tunnels: 41 tunnels with >120 km length

All sources (4)

  1. Construction of China-Kyrgyzstan-Uzbekistan railway to start on Dec. 27 - PresidentAKIpress News Agency · · EN
  2. Садыр Жапаров: строительство ж/д дороги Китай–Кыргызстан–Узбекистан начнется 27 декабряАзаттык Азия · · RU
  3. Строительство железной дороги Китай-Кыргызстан-Узбекистан стартует 27 декабряГазета.uz · · RU
  4. Китай, Кыргызстан и Узбекистан соединит железная дорога. Ее строительство начнется 27 декабряАзия-Плюс · · RU

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn