This summary was written by an AI.
The Emirati company Envirol plans a project in Uzbekistan for wastewater treatment and the conversion of fats into fuel products. The investment volume is $50 million. The goal is the installation of filters for fat separation from kitchen wastewater.
The project with a volume of $50 million is being implemented by the Emirati company Envirol. The core of the facility is the installation of filters that capture fats from kitchen wastewater. Currently, the wastewater contains excessive fat levels due to the lack of filtration systems, damaging the sewerage and treatment plants. Legal standards allow a maximum of one milligram of fat per liter of wastewater.
The separated fat is further processed within the framework of the project. It serves as raw material for the production of soap as well as lubricant and fuel-containing products. The conversion of waste into secondary raw materials such as household soap and animal feed is a central element of the value chain.
The measure is linked to a new government regulation coming into force on July 1, 2026. Thereafter, catering establishments may only connect to central sewage systems if they have grease traps. These must be cleaned monthly, and the resulting fat residues must be handed over for processing and disposal.
In January 2025, the acting chairman of JSC Uzsuvtaminot, Ahmad Suwonkulov, signed a cooperation agreement with Envirol. In May, the Minister for Investments, Industry and Trade, Laziz Kudratov, discussed with representatives of Envirol the construction of the first facility for converting waste into biofuel in Central Asia. Envirol is a joint venture with the government of Dubai and part of the Alserkal Group, active since 2006 and processing more than 500,000 liters of waste oil daily.
Key facts
- Investment volume: $50 million
- Implementation by: Envirol (United Arab Emirates)
- Entry into force of mandatory grease separation: July 1, 2026
- Products: Soap, lubricant and fuel-containing materials