This summary was written by an AI.
The EBRD has allocated a $66.4 million loan for the construction of a 230 km long, 500 kV high-voltage power line in Uzbekistan. The line will connect Sarimay in the Khorezm region and Muruntau in the Navoi region.
Project: Sarimay–Muruntau high-voltage power line · Uzbekistan · Agreed · $66 m
Key facts
- The loan amount is $66.4 million.
- The power line is 230 km long and operates at 500 kV.
- The line connects Sarimay (Khorezm region) and Muruntau (Navoi region).