Construction of eight production buildings has begun at the International Center for Industrial Cooperation "Central Asia" on the border with Uzbekistan. Engineering infrastructure, including power lines, roads, and gas connections, is being installed. The complex is scheduled to be completed in the fourth quarter of 2026.
Construction activities and infrastructure
Active construction is underway at the International Center for Industrial Cooperation "Central Asia" in the Turkestan region. On a 50-hectare site, power lines, a road, and gas connections are being installed. Construction of eight production buildings, each with 1,580 square meters of usable area, has already begun. These are intended for business projects producing medical devices, PVC products, processing cotton and organic waste, and manufacturing drip irrigation systems.
Planned expansions and timeline
Further areas are designated for a textile cluster, rice processing, logistics, and the food industry under the Greenfield model. The official launch of the center is targeted for the fourth quarter of 2026. These details were presented at a meeting of the operational working group on the development of cross-border hubs, chaired by Vice Prime Minister and Minister of National Economy Serik Zhumanagin.
Project: International Center for Industrial Cooperation "Central Asia" · Kazakhstan · Under construction
Key facts
- Location: Turkestan Region, border with Uzbekistan
- Area: 50 hectares
- Buildings: 8 production buildings of 1,580 m² each
- Infrastructure: Power, road, gas
- Planned launch: Q4 2026
All sources (1)
- Пять трансграничных хабов Казахстана: итоги и планыPrimeMinister.kz · · RU