A new electric train has been commissioned on the 324-kilometer ring railway in Uzbekistan's Fergana Valley region. The 586-seat vehicle, manufactured by the Tashkent Wagon Repair Plant, reaches speeds of up to 120 km/h. Tickets cost 15,000 UZS, making rail travel significantly cheaper than road transport.
A new electric train has been commissioned on the 324-kilometer railway ring line in Uzbekistan's Fergana Valley region. The initiative follows a presidential decree dated December 27, 2025, aimed at increasing passenger transport on local rail routes by 2030. The goal is to improve connectivity in the densely populated region and provide a safe, accessible transport option for citizens, businesses, and tourists.
The train was manufactured at the Tashkent Wagon Repair Plant. It consists of six cars, offers 586 seats, and reaches a maximum speed of 120 km/h. The capacity is up to 1,500 passengers per day and approximately 600,000 per year. The ticket price is 15,000 UZS, offering a significant cost advantage over road transport.
The cars are equipped with air conditioning, free Wi-Fi, and USB ports. Facilities for passengers with disabilities include elevators, accessible restrooms, and designated seating. Bicycle racks are also installed. Safety systems, including video surveillance and shock-absorbing elements, comply with international standards.
During an accompanying trip, the president discussed the economic impacts with local officials. It was emphasized that the new link will boost the tourism potential of the Fergana Valley. There is a need for additional service facilities, hotels, and catering establishments near stations to create additional income sources for the local population.
Project: Fergana Valley Ring Railway Electric Train · Uzbekistan · In operation
Key facts
- Length of the ring line: 324 kilometers
- Capacity: 586 seats, 1,500 passengers/day
- Maximum speed: 120 km/h
- Ticket price: 15,000 UZS
All sources (2)
- Казахстан инвестирует $10 миллиардов в железные дорогиКазинформ · · RU
- В Ферганской долине запущен новый электропоездKun.uz · · RU