The Asian Development Bank (ADB) has approved a loan of $233.1 million to modernize CAREC Corridor 2 in Uzbekistan. The project involves constructing a 75-kilometer bypass and reconstructing 12 kilometers of the existing A380 highway in the Republic of Karakalpakstan.
Project Scope and Financing
The Asian Development Bank (ADB) has approved financing for the "Resilience and Modernization of CAREC Road Corridor 2" project in Uzbekistan. The total project cost is $293.7 million, with the Government of Uzbekistan contributing $60.6 million. The ADB loan amounts to $233.1 million. The measures focus on the section of the A380 highway between the 581st and 698th kilometer, which runs through the Karakalpakstan region.
Construction and Technical Standards
As part of the project, a new 75-kilometer bypass road will be built from Turtkul via Ellikkala to Beruni. Additionally, 12 kilometers of the existing A380 route will be reconstructed. The design incorporates climate-resilient elements, including cement concrete pavement, elevated embankments, and improved drainage systems to withstand extreme weather conditions. Five rest and service areas will be developed along the corridor, featuring electric vehicle charging stations and gender-responsive facilities.
Digital Infrastructure and Traffic Safety
In addition to construction, the ADB supports the installation of intelligent transport systems and weigh-in-motion technologies. These technologies are intended for traffic monitoring, enforcement of axle load regulations, and reducing maintenance costs. The ADB emphasizes that the investments will strengthen Uzbekistan's role as a regional transit hub and promote inclusive economic growth in Karakalpakstan.
Project: Expansion of the A380 in Karakalpakstan · Uzbekistan · Under construction · $282 m
Key facts
- ADB loan volume: $233.1 million
- Total project cost: $293.7 million
- Contribution from the Uzbek government: $60.6 million
- Construction of a 75 km long bypass road (Turtkul – Ellikkala – Beruni)
- Reconstruction of 12 km of the existing A380
- Project location: Republic of Karakalpakstan, section 581–698 km of A380