The Turkmen branch of the Chinese SINOPEC has produced over one million tons of oil in four years under a contract with the state concern Türkmennebit. The total cost of services rendered amounted to approximately $200 million. The daily production volume increased by more than 1,500 tons due to the application of modern technologies.
The Turkmen branch of the international oilfield services company SINOPEC has produced over one million tons of crude oil over a four-year period. The work was carried out under a contract with the state oil concern Türkmennebit. The total value of the services rendered is approximately $200 million. The increase in daily production capacity by more than 1,500 tons is attributed to the implementation of modern technologies.
SINOPEC offers a wide range of oilfield services. These include sidetracking, directional and horizontal drilling, as well as well workover. Other services include acid treatments, water isolation operations, and the modernization of surface and downhole equipment. The company operates at various locations of the state concern.
In addition to the state concern's projects, SINOPEC was also active at the Shatlyk, Dowlatabad, Yashlydepe, and Bagtyyarlyk fields. There, the company carried out drilling, workover operations, and measures to increase oil and gas production. The results strengthen SINOPEC's position in Central Asia. The company plans to continue introducing modern technologies, improving efficiency in developing mature fields, and implementing new projects in Turkmenistan.
Project: Oil field development by SINOPEC · Turkmenistan · In operation · $200 m
Key facts
- Production volume: over 1 million tons of oil in four years
- Value of services: approximately $200 million
- Increase in daily production: more than 1,500 tons
- Participating fields: Shatlyk, Dowlatabad, Yashlydepe, Bagtyyarlyk
All sources (3)
- SINOPEC добыла в Туркменистане за четыре года свыше 1 млн тонн нефтиAsmannews · · RU
- SINOPEC добыла более 1 млн тонн нефти в Туркменистане за четыре годаhttps://terra-news.ru/ · · RU
- Туркменистан нарастил добычу природного газа на месторождении «Корпедже»https://terra-news.ru/ · · RU