The 'Ak Bulut' plant in Davletli, Turkmenistan, is exceeding its design capacity for dry mixes by 20%. Actual production reaches 60 thousand tons of dry mixes annually, compared to a design capacity of 50 thousand tons. The enterprise employs more than 350 staff and supplies products to both the domestic and international markets.
The plant produces approximately 150 types of products, including gypsum board and dry building mixes. Main equipment is supplied from Germany, China, and Turkey, with production lines managed through digital systems. Engineers developed the insulating material 'Boardline' for external walls based on soil and rock studies in the Kyzylorda region. 'Boardline' offers sound insulation and resistance to heat and moisture. A new production shop is planned for commissioning in late 2026 to increase total output volumes.
Project: Ak Bulut plant · Turkmenistan · In operation
Key facts
- Location: Davletli, Lebap region, Turkmenistan
- Design capacity: 50,000 tons of dry mixes and 4 million square meters of gypsum board per year
- Actual annual production: 60,000 tons of dry mixes, 4 million square meters of suspended ceilings, and 7,000 tons of galvanized metal profiles
- Staff size: More than 350 employees