The Kyrgyz section of the China-Kyrgyzstan-Uzbekistan railway will cost $5 billion. Transport Minister Zhamshit Kalilov stated the Torugart–Jalal-Abad line will be 432 km long.
Project: China-Kyrgyzstan-Uzbekistan Railway · Central Asia (regional) · Under construction · $4.7 bn
Key facts
- The railway will pass through Naryn and Jalal-Abad.
- Construction of 28 tunnels is being considered, with a total length of 68.72 km.
- The longest tunnel, measuring 14 km 400 meters, will be built in Kazarman.