Transport & logistics

Kazakhstan: World Bank Approves $846 Million Guarantee for Rail Project

Investors, volumes and stages of the region's major projects – for European suppliers

· 2 Sources

Scroll
Transport & logistics Kazakhstan2 Sources

Published · last updated · 19 Feb 2026

The International Bank for Reconstruction and Development (IBRD) has approved an $846 million guarantee for a railway project in Kazakhstan. The measure aims to mobilize $1.41 billion in commercial financing and improve the efficiency of the Trans-Caspian Transport Corridor.

Financing and Project Scope

On February 19, 2026, the World Bank Board of Executive Directors approved an IBRD guarantee of $846 million. This is intended to mobilize $1.41 billion in long-term commercial financing for the project 'Transforming Rail Connectivity in Kazakhstan (Middle Corridor Development)'. An additional guarantee of $564 million comes from the Asian Infrastructure Investment Bank (AIIB). The project aims to increase the efficiency and resilience of the Kazakh rail network.

Infrastructure Measures

The first component of the project finances the construction of a new 322.3-kilometer railway line between Mointy and Kyzylzhar. This connection eliminates a major detour in the network, shortens the corridor by 149 kilometers, and relieves heavily used sections. The new line enables the operation of double-stack container trains and is equipped with modern signaling and telecommunications systems that allow for expansion and future electrification.

Institutional Support

The second component includes technical assistance and institutional strengthening of the national railway operator 'Kazakhstan Temir Zholy' (KTZ). This includes support for tariff reforms, exploration of alternative financing mechanisms, and improvement of financial and environmental management. Additionally, KTZ is supported in preparations for a potential future initial public offering (IPO).

Goals and Impact

The project aims to triple freight volume on the Middle Corridor and halve total transit time by 2030. Shifting freight from road to rail is expected to reduce transport emissions. Investments are intended to improve market access, lower trade costs, and stimulate job creation along the new line. Implementation follows a multi-phase programmatic approach that gradually reduces reliance on sovereign guarantees.

Project: Transforming Rail Connectivity in Kazakhstan (Middle Corridor) · Kazakhstan · Financing · $1.4 bn

Key facts

  • Approval date: February 19, 2026
  • IBRD guarantee: $846 million
  • AIIB guarantee: $564 million
  • Mobilized commercial financing volume: $1.41 billion
  • New track length: 322.3 kilometers between Mointy and Kyzylzhar
  • Corridor shortening: 149 kilometers
  • Target year for freight increase: 2030

All sources (2)

  1. World Bank Support to Enhance Rail Connectivity and Logistics in KazakhstanWorld Bank Group · · EN
  2. Всемирный банк поддержит развитие железнодорожной связности и логистики в КазахстанеГруппа Всемирного банка · · RU

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn