Transport & logistics

Kazakhstan: KTZ Secures $540 Million Loan for Railway Corridor

Investors, volumes and stages of the region's major projects – for European suppliers

· 1 Source

Scroll
Transport & logistics Kazakhstan1 Source

Published · last updated · 1 Mar 2026

Kazakhstan Temir Zholy (KTZ) has secured a syndicated loan of 480 million Swiss francs (approx. $540 million) for three years. The funds are designated for upgrading the Trans-Kazakhstan Railway Corridor and refinancing existing debt.

Kazakhstan Temir Zholy (KTZ) has secured a syndicated loan of up to 480 million Swiss francs, approximately $540 million, for a three-year term. The financing was arranged by Abu Dhabi Commercial Bank and Deutsche Bank. The funds are specifically allocated for infrastructure projects along the Trans-Kazakhstan Railway Corridor.

The financing covers the construction of the Moiynty-Kyzylzhar section and upgrades for congested segments of the national rail network. Additionally, the loan is used to refinance existing debt. The goal is to solidify Kazakhstan's role as a major overland transit hub connecting China and Europe.

Infrastructure improvements are expected to reduce delivery times, lower logistics costs, create jobs, and diversify international trade routes. Currently, more than 80% of overland freight from China to Europe passes through Kazakhstan via the Trans-Caspian International Transport Route (TITR), also known as the Middle Corridor, which circumvents Russia. In 2024, freight volumes along the TITR surged by 60% to 4.5 million tons.

Kazakhstan aims to more than double the freight volume to 10 million tons by 2030. This is part of the broader ambition to expand its footprint in global supply chains, enhancing both the resilience of the economy and the competitiveness of the transport sector.

Project: Transforming Rail Connectivity in Kazakhstan (Middle Corridor) · Kazakhstan · Financing · $1.4 bn

Key facts

  • Loan volume: 480 million CHF (approx. $540 million)
  • Term: Three years
  • Purpose: Construction Moiynty-Kyzylzhar, network upgrades, debt refinancing
  • Target year 2030: 10 million tons of freight on the TITR route

All sources (1)

  1. KTZ Secures $540 Million Loan to Upgrade Trans-Kazakhstan Railway CorridorThe Times Of Central Asia · · EN

Imprint | Information pursuant to § 5 DDG

Company

AETEK GmbH Lindenstraße 5
63808 Haibach, Germany

Managing Director

Artur R. Pamin

Commercial Register

Amtsgericht Aschaffenburg
HRB 14157

VAT ID No.

DE288091462

EORI No.

DE644795536634916

Scan · LinkedIn