Residents of the Gate City complex in Alatau faced recurring power and water outages. Affected inhabitants demanded transparent information from local authorities and the President, as well as a swift resolution of the infrastructure deficiencies.
District: Gate (named in the source)
Key facts
- Recurring power and water outages in the Gate City residential complex.
- Affected residents addressed an open letter to President Tokayev and local administration.
- President Tokayev criticized the slow pace of resolving infrastructure problems in Alatau in June.
- Residents live without a gas connection and are fully dependent on electrical supply.
All sources (2)
- Жители Алатау вновь столкнулись с перебоями света и водыUlysmedia.kz · · RU
- Алатау тұрғындары жарық пен судың жиі өшуіне шағымданып, Тоқаевтан көмек сұрадыUlys Media (Telegram) · · KK