A 950-meter-long road bridge complex has been opened to traffic in the new city of Alatau. The infrastructure project connects the settlements of Nura and Tuganbai with the city of Zhetigen, relieving the previous level crossing. The bridge is designed for more than 15,000 vehicles per day.
District: Green (derived from the type of project)
Key facts
- Opening of a 950-meter-long road bridge complex over a railway line.
- Connection of the settlements of Nura and Tuganbai with the city of Zhetigen.
- Capacity: more than 15,000 vehicles daily.
- Elimination of waiting times of up to 40 minutes at the previous level crossing.
- Part of the project for the development of the Almaty railway hub.
All sources (2)
- В Алатау открыли мост, который избавит водителей от 40-минутных пробокInformburo (Telegram) · · RU
- Новый мост открыли в Алатау и разгрузили движение24.kz (Telegram) · · RU