The Almaty region is preparing to introduce electric air taxis connecting the new city of Alatau with Almaty. Alatau Advance Air Group is designated as the operator, holding strategic partnerships with US manufacturer Joby Aviation. The selected S4 aircraft are designed for four passengers and one pilot.
District: Gate (derived from the type of project)
Key facts
- Operator is Alatau Advance Air Group, founded in March 2025.
- Strategic partner is US manufacturer Joby Aviation with the S4 model.
- Demonstration flights are scheduled for 2026.
- In November, a strategic agreement was signed for the purchase of eVTOL aircraft valued at approx. $300 million.
- The Almaty region is preparing to introduce the first air taxi service in Kazakhstan.
All sources (1)
- From Alatau to Almaty by Air: How Kazakhstan’s First Air Taxi Service Will OperateThe Times Of Central Asia · · EN